Target Workloads

Who we serve

Tailored capacity designed to support hyperscale platforms, sovereign data requirements, and mission-critical enterprise operations.

Cloud and AI providers

Scalable space and power for cloud platforms, AI infrastructure and GPU hosting providers.

Government and sovereign users

In-country hosting for public-sector workloads, with procurement, security and service requirements agreed per customer.

Enterprise customers

Capacity for organisations planning cloud migration, business continuity and regional digital services.

Architecture & Engineering

Campus design concept

Modular, high-density infrastructure engineered specifically for modern compute and accelerator clusters.

Critical power

A/B distribution ensuring continuous, isolated delivery paths to all tenant compute halls with concurrent maintainability.

IT and GPU data halls

150 MW IT load across 3 × 50 MW modular expansion phases.

Connectivity

Diverse fibre and carrier meet-me rooms ensuring redundant carrier interconnects.

Liquid cooling

Direct-to-chip or rear-door, precision-matched to tenant equipment.

AI-ready infrastructure

Mixed rack densities, with cooling interfaces matched to tenant equipment.

Sustainable Energy Architecture

Power and energy concept

Engine-free green power combining dedicated solar PV generation, comprehensive BESS battery storage, and dual high-voltage grid paths.

Solar PV Generation
300 MWp
Dedicated on-site photovoltaic generation capacity.
PV-Paired Storage
120 MW / 480 MWh
Battery storage directly coupled with solar generation.
Standalone BESS
80 MW / 320 MWh
Independent reserves providing frequency and grid support.
Annual Efficiency Target
1.30 PUE
195 MW facility demand at full IT load under design parameters.
Operational Excellence

Reliability and operational readiness

Strict engineering validation, continuous monitoring, and structured operational discipline.

Concurrent-maintainability objectives, supported by failure studies and integrated systems testing.

Multiple carriers, physical route diversity and separate entries, supported by route drawings and service agreements.

An operator plan covering staffing, monitoring, maintenance, training and documented incident recovery.

Availability and service remedies will match the completed design and verified commissioning performance.

High-density compute racks and modular server infrastructure planned for the Talonex Kenya campus
Benchmark Reference

Project Savanna energy comparison

100 MW, whole-campus estimate illustrating energy supply balance under solar-hybrid vs. grid-only models.

Parameter Solar + grid Grid-only
Annual electricity demand 1,104 GWh 1,104 GWh
On-site solar capacity 200 MWp None
Solar contribution 390 GWh (about 35%) None
Grid contribution 714 GWh (about 65%) 1,104 GWh (100%)